|
|
Wfpm Clarksville s Riverside Drive Pedestrian Bridge to get Painted
Tennessee 16-13 | 8-8 SEC at Kentucky 24-5 | 14-2 SEC Tuesday, March 3rd, 2020 | 8:05pm CTLexington, KY | Rupp Arena | TV: ESPNLexington, KY The Tennessee Vols basketball stanley quencher team hits the road for a Tuesday night contest against sixth-ranked Kentucky inside Rupp Arena. Tipoff between the Vols and the Wildcats is set for 8:00pm CT on ESPN.Tuesday game can be seen on ESPN, online through WatchESPN, which can be accessed at espn/watch and on any mobile device through the ESPN App. Karl Ravech and Jimmy Dykes will have the call.Fans can also listen in on their local Vol Netwo stanley website rk affiliate to hear Bob Kesling and Bert Bertlekamp describing the action.Tennessee Men Basketball travels to Kentucky to take on the Wildcats Tuesday at Rupp Arena. UT Athletics Last time out, the Vols battled past SEC rival Florida, 63-58. UT was led by junior All-SEC candidate, John Fulkerson, who poured in a game-high 22 points, finishing 10-of-15 from the field, while knocking down his first career 3-point field goal.Freshman Josiah-Jordan James was also incredibly productive, scoring 12 points, pulling in eight rebounds, dishing off a season-high-tying six ass stanley quencher ists, while rejecting two shot attempts and nabbing a steal on the defensive end.The story of the day came from freshman Santiago Vescovi, who parents surprised him prior to tipoff. His parents and sister traveled through the night from Uruguay, arriving while Vescovi was completing his pregame routine.A win on Tue Prly Clarksville s Northeast Eagles lose 43-14 to Henry County Patriots in State Semifinal game
TDOT Projects CNH155 Red River Bridge and CNK249 Resurfacing College Street聽Clarksville, TN CNH155 Red River Bridge completion of all bridge work is expected to be done by the end of this week.聽 Final paving operations have begun and should be finished by Saturday, with all lanes open to traffic late Saturday afternoon.Some additional work will be necessary next week for a couple of days to fully complete all work. Temporary lane closures can be expected, with delays, through the end of next week at this location.聽CNK249 College Street Resurfacing milling oper stanley france ations started this morning on College Street, from Kraft Street to Riverside Drive.聽Paving operations are also in progress at the intersection of North 2nd Street and College Street in order to reopen it by the end of this week if all goes as scheduled.Milling and paving operations will continue for the next two weeks along College Street, and depending on the weather, all work might be completed by the third week of December.聽 Motorists can expect lane closures on a daily basis, and minor delays will be encountered.聽Due to the necessary lane closures needed to complete all work on both projects, Motorists can expect delays on a daily basis, and an alternate route sh termos stanley ould be considered if all pos stanley website sible. In addition, Motorists should be alert to Contractor Personnel and Equipment in the roadway, along with differing roadway conditions while traveling through Wilma Rudolph Boulevard and College Stree |
|